How to read an application schedule
Why one notice has many dates, the order they run in, and how leftover-unit and LH notices differ.
Why one notice has many dates
A Korean apartment sale does not take every application on one day. Groups with narrower eligibility apply first, so special supply, rank 1 and rank 2 open on different days for the same complex. That is why one notice spans several days on the calendar.
Opening hours differ by notice and Applyhome usually accepts applications on weekday daytime only. All dates are Korea time.
The steps in order
- Special supply
- Newlyweds, first-time buyers, families with many children, people supporting elderly parents and agency referrals apply first, a day or two before the general supply.
- Rank 1, local
- Rank-1 applicants who have lived in the area long enough apply first. Regulated areas require longer residence.
- Rank 1, other areas
- Units left after the local round go to rank-1 applicants from other areas; the capital region may take other-Gyeonggi applicants separately.
- Rank 2
- Takes what is left after rank 1, and does not open if nothing is left.
- Winners
- Results, building and unit numbers are published on Applyhome.
- Contract
- Winners submit documents and sign. An ineligible application can be cancelled at this stage.
Leftover units, officetels and LH notices
Leftover-unit notices re-offer homes returned after cancellations or ineligible wins, usually in a single day without ranks.
Officetels, urban-type housing and private rentals run on one application day instead of savings-account ranks.
LH notices cover homes for sale, rentals (happy, national, permanent), housing welfare and newlywed towns. We show the posting and closing dates; check the detailed schedule in the LH original.
What the status labels mean
| Status | Rule (Korea date) |
|---|---|
| Opens soon | Before the first application day |
| Open now | From the first to the last application day, inclusive |
| Awaiting results | From the day after applications close to the winners day |
| Contracts | From the day after the winners day to the last contract day |
| Closed | After the contract period |
Alerts and calendars
Notice alerts go out at 8 pm the evening before and 8:30 am on the day of an application step, and at 8:30 am on the winners day. Nothing is sent between 10 pm and 8 am, and more than five a day are folded into one.
If your device cannot receive push, use Add to calendar for a file, or sign in for a private calendar feed. Google Calendar may refresh subscriptions hours later, so push is better for urgent dates.
Data sources
Korea Real Estate Board Applyhome notices and results, LH sale and rental notices, and the Ministry of the Interior public service (benefits) data, all from the official open APIs on data.go.kr. Every page shows the source and when it was last checked.
This site organizes public information. Applications are made only on Applyhome, LH and each agency's site, and the official notice prevails.
Sources: Korea Real Estate Board Applyhome, LH, Ministry of the Interior public service data (data.go.kr) · seewol.com